Carico immediato

Finalization of a prosthesis (Toronto Bridge) with the technique of the injection of resin Acrylic For Dentures MP made through Implant Box.

MATERIALS USED:

  • Bond Opaco pink-dark
PRODUCTS USED:

  • Easy Bar
  • Putty Silicone 70 Shore
TIMES

  • Transformer system: 6 hours
  • Traditional system: 10 hours

 

EASY BAR

Via Colloredo 80 – Frazione Modoletto 33010 Pagnacco (UD) – Italia

Tel (+39) 0432 650047 | Fax (+39) 0432 650635
Email: info@trasformersystem.com 

© Copyright 2024 Trasformer® è un marchio P.P.M. Srl  | P.iva 01703190304 | NOTE LEGALI E PRIVACY  | PROTOCOLLI